Section 179D expired for new projects. That removes a familiar federal incentive for commercial real estate developers — but it doesn’t remove the tax conversation. It moves it to other parts of the project.
The One Big Beautiful Bill Act set a hard end date for the Section 179D energy-efficient commercial buildings deduction. Under current law, 179D is unavailable for projects that begin construction after June 30, 2026. For developers who have leaned on it to help offset qualifying HVAC, lighting and building-envelope costs, that’s a real change to the after-tax math on new construction.
This post covers what actually changed now that 179D expired, one detail that’s widely misread, and where developers can still look for decisions that affect after-tax return.
Why 179D Expired
179D had been on the books since 2006 as a deduction rewarding energy-efficient commercial building design — HVAC, lighting and building envelope that reduce a facility’s energy use against the applicable standard. The OBBBA, enacted in 2025, set an expiration tied to when construction begins. Projects beginning construction after June 30, 2026 are no longer eligible. In short, 179D expired for new construction going forward, while remaining available to projects that broke ground in time.
The Detail People Get Wrong
The deadline is the construction-start date, not the placed-in-service date. A project that breaks ground on or before June 30, 2026 can still qualify even if it isn’t completed and placed in service until later. The IRS generally recognizes two ways to establish that construction has begun — a physical-work test and a 5% safe harbor — along with a continuity requirement through completion.
Practically, that means two developers with similar buildings can end up in very different positions based solely on when they broke ground. If you have a project in or near that window, whether 179D still applies is a timing question worth confirming with your CPA now rather than assuming.
179D Is One Incentive — Not the Whole Tax Picture
It’s easy to treat the fact that 179D expired as “the tax benefit went away.” It didn’t. 179D was always one line item in a much larger after-tax analysis. Two of the more significant areas for new construction are untouched by its expiration.
Cost segregation
An engineering-based cost segregation study reclassifies portions of a building from long-life real property (39-year) into shorter-life categories — 5, 7 and 15-year — that depreciate faster. On new construction, the study can work directly from actual construction-cost detail, which supports a more precise and better-documented result than reconstructing costs after the fact. This accelerates deductions into the early years and can improve after-tax cash flow when a project needs it most. None of that depends on 179D.
Bonus depreciation
Where qualifying property has a recovery period of 20 years or less, current federal law may allow 100% first-year bonus depreciation, subject to Section 168(k) and the applicable timing, placed-in-service and election rules. Paired with a cost segregation study that identifies eligible 5, 7 and 15-year property, this can meaningfully change when deductions are taken — which is often where the cash-flow value lives.
Neither of these is a claim about any specific project. Availability and treatment depend on the facts, the timing and the taxpayer’s situation, and your CPA should confirm how the rules apply.
A Construction Decision Most Developers Overlook
Now that 179D expired, it’s a good moment to look harder at a building component that owners will almost certainly touch again: the interior partitions. Conventional drywall turns every future renovation, brand refresh or property improvement plan into a demolition project. A demountable partition system built in at design — before the drywall goes up — introduces a different lifecycle question and, depending on the facts and circumstances, may support different tax treatment for qualifying components.
That’s a decision best made while the project is still on the drawing board. We break it down for ground-up hotels specifically here: Ground-Up Hotels: Capture the Tax Strategy Before the Drywall Goes Up.
What to Do If You Have a Project in the Pipeline
If you’re developing or planning new construction, three questions are worth putting in front of your CPA now: whether any in-flight project can still establish a 179D construction-start date before the deadline; whether a cost segregation study is being planned from actual construction-cost detail rather than after the fact; and whether interior partition decisions are being made with future renovation cycles in mind. The fact that one incentive expired is a reason to look more closely at the others — not a reason to stop planning.
Go Deeper
These strategies are part of a larger after-tax framework laid out in Tax Logic for Commercial Real Estate by Nick Coppola — a practical guide to following a deal’s tax consequences from acquisition and construction through operations, renovation and exit. Available on Amazon in Kindle and paperback.
This article is general information, not tax advice. Tax treatment depends on property-specific facts, ownership structure, taxpayer activity and applicable law, including the timing and election rules under Section 168(k). Owners should consult their CPA and tax counsel before acting on any strategy described here.